Meter systems connect your building supply to present and future demand. We assess the existing installation, available space and planned loads together.
What we consider
- Meter positions and central metering
- Metering concepts and supply capacity
- Distribution boards and protection
- Provision for future loads
Assess the installation. Define the work.
For an initial assessment, tell us the location, building type and intended work. Photos help if they can be taken without opening electrical covers. We then agree whether documents are sufficient or a site visit is needed.
Planned for your property. Clearly priced.
The scope depends on condition, demand and technical requirements. You receive a quote for the agreed work, including the planned installation, testing and documentation.
eHZ meter positions in Berlin
For directly metered installations, Berlin’s default meter operator generally uses plug-in eHZ meters. These need a compatible mounting and contact system. A digital display alone does not identify the meter-position design.
Plan the meter position and future needs together
Metering, additional applications, protection and spare capacity are planned for the property. In Brandenburg, we first identify the responsible grid operator; Berlin requirements do not automatically apply.
Technical references: Stromnetz Berlin · TAB · E.DIS · TAB · Hager · eHZ
What does OE assess in a meter system?
OE considers existing meter positions, the number of units and planned loads such as charging, PV or heat pumps together. An eHZ position has a compatible contact system; a digital display alone does not identify this design. The suitable solution depends on the property and responsible operator.
View genuine OE project photographs · Discuss your project with OE







