An outdoor meter cabinet can suit properties without a suitable indoor meter location. Position, cable routes and requirements are agreed before installation.
What we consider
- Location and access
- Coordinate foundation and cable routes
- Customer-side electrical installation
- Coordinate the grid connection project
Assess the installation. Define the work.
For an initial assessment, tell us the location, building type and intended work. Photos help if they can be taken without opening electrical covers. We then agree whether documents are sufficient or a site visit is needed.
Planned for your property. Clearly priced.
The scope depends on condition, demand and technical requirements. You receive a quote for the agreed work, including the planned installation, testing and documentation.
What helps when planning an outdoor meter pillar?
Provide the site location, intended use and planned loads. Existing connection documents and the proposed position help with coordination. Location, access, cable routes and operator requirements are clarified before installation.
View genuine OE project photographs · Discuss your project with OE




